EasyManua.ls Logo

Tecnam P2002 JF - Page 93

Tecnam P2002 JF
1289 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
nd
Edition - Rev 0
Page 15
05-20
INSPECTION PROGRAM
ATA
Item
Maintenance task
FREQUENCY
A
B
C
D
E
71
Power Plant
Check on the air box the carburetor
heating control leverage for condition
and operation.
X
71
Power Plant
Check for free movement of throttle,
choke and carburetor heat levers.
Check bowden cables full travel and
correct operation. Check for restricted
movement, interference or unusual
play. Check friction for operation.
X
71
Power Plant
Engine compartment: check for fuel,
oil and coolant liquid leakages; in-
spect hoses, fittings, clamps and all
other components of the systems for
cracks, holes, dents, bulges, and other
signs of damage that might restrict
the fluid flow or cause a leakage. All
lines must be inspected to ensure that
they are properly supported and are
not rubbing against a structure. Fit-
tings should be checked for signs of
improper installation, over-torqueing,
excessive tension, or other conditions
which may lead to a failure. Inspect
engine parameters sensors for general
condition and security of installation.
X
75
Coolant system
Check coolant circuit: there should be
no indication of leakages.
X
75
Coolant system
Check thermostatic valve for correct
operation and no leakage.
X
75
Coolant system
Check coolant level in the expansion
tank and overflow bottle.
X
75
Coolant system
Visually inspect coolant overflow
bottle and coolant radiator for condi-
tion and security of installation.
X
78
Exhaust
Visually inspect exhaust manifold,
muffler and heat exchanger for condi-
tion and security of installation.
X

Table of Contents

Other manuals for Tecnam P2002 JF

Related product manuals