Step 5
Slide the deep-front panel screws inwards using the plastic tabs to engage the retention features and the pins
with the shelf notches and hinges (see the figure below). Verify the engagement by gently applying the pressure
to the panel outwards.
Figure 69: Engage the Deep-Front Panel and Shelf
Step 6
Lock the deep-front panel by tightening the screws to a torque value of 6.5 in-lb (0.75 N-m).
Step 7
Connect the other end of the ground strap cable to the ground point present on the deep-front panel exterior.
Figure 70: Connecting the Ground Strap Cable
Cisco NCS 2000 Series Hardware Installation Guide
120
Installing the Cisco NCS 2002 Door and Other Modules
NTP-L40 Installing the Deep-Front Panel of the NCS 2002 Shelf