Step 6
Install the horizontal air plenum above the vertical plenums. Follow step 3a to step 3c.
Figure 89: Installing the horizontal air plenum above the vertical plenums
Cisco NCS 2000 Series Hardware Installation Guide
148
Installing the Air Flow Regulator
DLP-L64 Installing Air Plenum for NCS 2006 Shelf in ANSI 19-inch Cabinet