Procedure
Step 1
Verify that the AC power module is installed in Slot A or Slot B (or both) of the NCS 2006.
Step 2
Attach the AC power cable to the cable connector in the AC power module (see the figure below).
Figure 119: Connecting Office Power
—
AC Power Modules
Cisco NCS 2000 Series Hardware Installation Guide
206
Connecting Power and Ground
DLP-L18 Connecting Office Power (AC) to the NCS 2006 Shelf