19. Pass the cables through the arch.
Installation
1. When mounting the Left Roll Support, make sure to pass both cables through the arch.
NOTE: Be careful with the routing, make sure it is the same as when the cables were removed. Check
that it does not obstruct any moving parts or prevent any covers from being installed correctly.
2. Make sure the Left Roll Support is attached inside the two holes.
NOTE: When connecting the cables to the Main PCA, make sure that the blue side of the at cables is
facing you; and, with the red/black cables, the red color should always be on the left.
296 Chapter 5 Removal and installation ENWW