c) Route the other end of the ground strap cable outside the shelf at an angle of 180 degrees towards the left
direction.
Figure 64: Inserting the Lug to the Shelf
Step 2
Loosen the deep-front panel screws and slide them outwards using the plastic tabs .
Figure 65: Align the Deep-Front Panel and Shelf
Cisco NCS 2000 Series Hardware Installation Guide
117
Installing the Cisco NCS 2002 Door and Other Modules
NTP-L40 Installing the Deep-Front Panel of the NCS 2002 Shelf