EasyManua.ls Logo

Fujitsu PRIMERGY RX350 S8

Fujitsu PRIMERGY RX350 S8
792 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
496 Upgrade and Maintenance Manual TX300 S8 / RX350 S8
Processors
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section "Updating or recovering the system board
BIOS and iRMC" on page 134.
Ê "Enabling SVOM boot watchdog functionality" on page 146
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task: "Resuming BitLocker functionality" on page 152
11.3 Removing processors
V CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.3.1 Preliminary steps
Ê "Suspending BitLocker functionality" on page 125
Ê "Disabling SVOM boot watchdog functionality" on page 127
Ê "Shutting down the server" on page 62
Ê "Disconnecting the server from the mains" on page 63
Ê When working on a rack-mounted server:
"Extending / removing the server from the rack" on page 64
Ê Bring the server to its horizontal position.
Ê Open the side / top cover as described in section "Opening the server" on
page 68.
Upgrade and Repair Unit
(URU)
Average task duration:
20 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver

Table of Contents

Related product manuals