Ê Run the GPGPU card power cables through the cable clamps on the server
floor as shown.
I For further information on GPGPU card installation and cabling,
please refer to section "Installing a GPGPU / coprocessor card" on
page 382.
6.5.4 Concluding steps
Ê "Installing the system board carrier" on page 88
Ê "Installing the system board" on page 691
Ê Reinstall all rear expansion cards into their original slots as described in
section "Installing expansion cards" on page 349.
Ê Reconnect all cables to the system board. For a complete cabling overview,
please refer to section "Cabling overviews" on page 738.
Ê Reinstall all fan modules and fan holders as described in the related
sections:
– "Installing the system fan holder" on page 331
– "Installing system fan modules" on page 327
– "Installing the rear fan holder" on page 342
– "Installing rear fan modules" on page 332
Ê "Installing the system air duct" on page 83.
Ê "Closing the server" on page 98.
Ê When working on a rack-mounted server:
"Mounting the server in the rack" on page 115
Ê Reconnect all external cables.
Ê "Connecting the server to the mains" on page 118