11.5 Handling processor heat sinks
11.5.1 Preliminary steps
Ê "Shutting down the server" on page 62
Ê "Disconnecting the server from the mains" on page 63
Ê When working on a rack-mounted server:
"Extending / removing the server from the rack" on page 64
Ê Bring the server to its horizontal position.
Ê Open the side / top cover as described in section "Opening the server" on
page 68.
Ê "Removing the system air duct" on page 81
Upgrade and Repair Unit
(URU)
Average task duration:
15 minutes
Field Replaceable Unit
(FRU) if thermal paste is involved
Tools: Phillips PH2 / (+) No. 2 screw driver