EasyManua.ls Logo

Inficon HAPSITE Smart - Page 446

Inficon HAPSITE Smart
554 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14 - 14
IPN 074-397-P1G
HAPSITE Smart Operating Manual
The Roughing Pump will start first, then the Turbo pump will begin to speed up, as
shown on the Turbo Speed (Hz) line in Figure 14-15 above (initially listed as 0).
NOTE: The attach procedure typically takes about 5 minutes to complete.
After selecting the Attach button, the HAPSITE Properties window can be closed
at any time.
Figure 14-17 Attach In Process
Figure 14-18 Attach Successful

Table of Contents

Related product manuals