MAINTENANCE AN D SERVICING
2. Position right-hand reel tube against reel drive and
engage stub shaft into U-joint pilot hole.
3. Rotate reel until holes in end of reel tube and U -joint
flange (B) line up.
4. Install four bolts (A) and torque to 70–80 ft·lbf
(95–108 N·m).
Figure 5.255: U-Joint
5. Remove tem
porary reel support.
Figure
5.256: Reel and Reel Support
Instal
ling Drive Cover
1. Position the lower cover (C) first (if removed) and
secure with three bolts (D).
2. Install upper cover (A) using the six bolts (B).
Figure 5.257: Double-Reel Drive Cover
147695 377 Revision A