EasyManua.ls Logo

Siemens SINAMICS G120XA - Backup Using the Operator Panel; Transfer to the Converter

Siemens SINAMICS G120XA
918 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.2 Operator panel
8.2.1 Backup using the operator panel
Precondition
The converter power supply has been switched on.
Function description
Procedure
(;75$6
72%23
1. In the "OPTIONS" menu, select "TO BOP".
(6&2.
2. Start data transfer with OK.
6$9,1*
3$U$6
3. Wait until the converter has backed up the settings to the BOP‑2.
=,3,1*
),/(6
;;;<<<
&/21,1*
72%23
G2Q(
You have backed up the settings to the BOP-2.
8.2.2 Transfer to the converter
Precondition
The converter power supply has been switched on.
Saving the settings and series commissioning
8.2 Operator panel
SINAMICS G120XA converter
732 Operating Instructions, 03/2019, FW V1.0, A5E44751205B AB

Table of Contents

Related product manuals