EasyManua.ls Logo

NEC Univerge SV9100 - Page 1173

NEC Univerge SV9100
1402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1173
On power up, all GSWU boards are assigned as Main boards, or generic Add-on boards (by no
IP address or IP address of 0). In order to include the Add-on boards as part of the managed
stack and assign port numbers, the CCPU will send a “Board Type” message to the Add-on
card. This will identify the port assignment of the Add-on card to the Main card for stacking.
The grouping of the three GSWU units to form a 20-port switch is restricted to reside in a single system
location. Stacking is not supported for those GSWU units in remote locations supporting the NetLink
feature.
Conditions
When Auto Negotiation is denied and port speed is set to 100Mbps, the yellow LED
(located on the RJ45 connector) is ON. When port speed is set to 10Mbps, this LED is
OFF.
The number of supported GCD-ETIA blades are to be determined by the power
consumption chart. Reference Hardware manual for more details.
When linking multiple GCD-ETIA cards each card must be statically assigned an IP
address and each blade must be linked.
Default Settings
None
System Availability
Terminals
None
Required Components
GCD-ETIA
Related Features
None
Guide to Feature Programming
Program
Number
Program Name/Description
Input Data
Default
10-55-01
Package Network Setup IP Address
Define the IP Address for the GCD-ETIA.
When the blade is deleted from the system
using Program 90-05, the programming for the slot
in 10-55 is set back to default.
0.0.0.0 ~ 126.255.255.254
128.0.0.1 ~ 191.255255.254
192.0.0.1 ~ 223.255.255.25
172.16.1.100
10-55-03
Package Network Setup Main/Add-on
Use the Main setting to distribute an IP Address
to the blade.
0 = Main
1 = Add-on
1

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals