Power Meter Remote Operation 1
N1911A/1912A P-Series Power Meters Programming Guide 3
Status Reporting 50
• The General Status Register Model 50
• How to Use Register 53
• The Condition Polling Method 53
• The SRQ Method 54
• Device Status Register 65
• Using the Operation Complete Commands 67
Saving and Recalling Power Meter Configurations 69
• How to Save and Recall a Configuration 69
Using Device Clear to Halt Measurements 70
An Introduction to the SCPI Language 71
• Mnemonic Forms 71
• Using a Colon (:) 71
• Using a Semicolon (;) 72
• Using a Comma (,) 72
• Using Whitespace 72
• Using “?” Commands 72
• Using “*” Commands 73
• Syntax Conventions 73
• Syntax Diagram Conventions 73
• SCPI Data Types 74
• Input Message Terminators 79
SCPI Compliance Information 81
Summary of Commands 83