Installing HiPath 3000
P31003-H3550-S403-4-7620, 02/05
4-96 HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
inst_h3.fm
Installing HiPath 3750, HiPath 3700
Installing a two-cabinet system
Laying the Connecting Cables
To lay the connecting cables between the two cabinets, you can cut out the pre-stamped re-
cesses in the bottom of EC1 and the top of the BC with a pair of diagonal cutting pliers and
break them out with a pair of flat-nosed pliers.
Figure 4-51 HiPath 3750 - Installing a Two-Cabinet System (Stacked)
7
Caution
Be careful when breaking out the recesses. Remove any sharp edges and corners.
Inside
the cabinet
Washers
BC
EC1
EC1
BC