EasyManua.ls Logo

Siemens HiPath 3000 - Figure 4-51 Hipath 3750 - Installing a Two-Cabinet System (Stacked)

Siemens HiPath 3000
1144 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing HiPath 3000
P31003-H3550-S403-4-7620, 02/05
4-96 HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
inst_h3.fm
Installing HiPath 3750, HiPath 3700
Installing a two-cabinet system
Laying the Connecting Cables
To lay the connecting cables between the two cabinets, you can cut out the pre-stamped re-
cesses in the bottom of EC1 and the top of the BC with a pair of diagonal cutting pliers and
break them out with a pair of flat-nosed pliers.
Figure 4-51 HiPath 3750 - Installing a Two-Cabinet System (Stacked)
7
Caution
Be careful when breaking out the recesses. Remove any sharp edges and corners.
Inside
the cabinet
Washers
BC
EC1
EC1
BC

Table of Contents

Other manuals for Siemens HiPath 3000

Related product manuals