inst_h3.fm
P31003-H3550-S403-4-7620, 02/05
HiPath 3000 V5.0, HiPath 5000 V5.0, Service Manual
4-193
Installing HiPath 3000
Installing HiPath 3550, HiPath 3350, HiPath 3500, and HiPath 3300
Procedure: Ground the system
Proceed as follows to ground the HiPath 3500 and HiPath 3300 systems (see also diagram be-
low).
4.4.4.7 Installing the Boards
The systems are already equipped with the boards needed for the customer’s specific require-
ments.
Step Activity
1. Connect the grounding cable to the potential equalization bar on the 19-inch cab-
inet.
2. Connect the grounding cable to the system’s ground connection with the ground-
ing screw supplied (point A).
3. Attach the grounding cable (strain relief) to the system (point B) with a cable tie.
Figure 4-109 HiPath 3500 and HiPath 3300 - Grounding
7
Danger
The HiPath 3500 and HiPath 3300 housing to be wall-mounted must be grounded by
a separate ground conductor (such as a potential equalization bar). Make sure that
the ground conductor is securely installed and strain-relieved.
Failure to follow these instructions can result in electrical shock.
HiPath 3500 and HiPath 3300
systems
A
B
Grounding cable
Potential equalization bar