EasyManua.ls Logo

Siemens SINAMICS G120X - Removing Screw for Functional Grounding, FSG; Disconnecting the Basic Interference Suppression Module, FSH;FSJ

Siemens SINAMICS G120X
1148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TT system (Page 77)
IT system (Page 78)
Precondition
Switch off the converter power supply before removing the functional grounding.
WARNING
Electric shock as a result of a residual charge in power components
After the power supply has been switched off, it takes up to 5 minutes until the capacitors in
the converter have discharged so that the residual charge is at a non-hazardous level.
Therefore, touching the converter immediately after powering off can result in electric shock
due to residual charge in the power components.
Check the voltage at the converter connections before you remove the functional
grounding.
Removing screw for functional grounding, FSG
Disconnecting the basic interference suppression module, FSH/FSJ
If a converter FSH or FSJ is operated from a non-grounded line supply (IT system), the
connection to the basic interference suppression module of the Power Module must be opened.
Procedure
1. Open the left-hand housing flap of the converter by rotating latch .
2. Release the two captive screws and .
3. Release the screws , , and , but do not remove the screws.
Wiring
4.1 Line supply and motor
SINAMICS G120X converter
Operating Instructions, 06/2019, FW V1.01, A5E44751209B AC 79

Table of Contents

Other manuals for Siemens SINAMICS G120X

Related product manuals