OPERATION
2. Park windrower on level gr ound.
3. Raise header fully and hold momentarily to allow lift
cylinders to rephase.
Figure 4.84: Ground Speed Lever (GSL)
4. Set header
approximately 6 in. (150 mm) off ground
and check t
hat member (A) is against link (B). Stop
engine and
remove key from ignition.
5. Measure d
istance to ground at both ends of header and
determin
e the end that is higher.
6. If adjust
ment is necessary, start engine and raise
header fu
lly. Turn off engine and remove key from
ignition
.
Figure 4.85: Lift Linkage
7. Move flo
at pins to engaged position (A).
Figure 4.86: Float Pins – Engaged