OPERATION
CAUTION
Check to be sure all bystanders have cleared the area.
18. Start the engine and activate the header down
switch (A) on the GSL t o f ully lo wer the header.
19. Stop engine and remove key from ignition.
Figure 4.198: GSL
20. Connect he
ader drive hoses (A) and electrical
harness (B
) to header. Refer to the draper header
operator
’s manual.
Figure 4.199: H e ader Dri ve Ho ses and Harn es s
4.5.4 D etaching an A-Series Header
Refer to the procedure that is appropriate for the center-link installed on the windrower:
• Detaching an A-Series Header: Hydraulic Center-Link, page 250
• Detaching a n A-Series Header: Mechanical Center-Link, page 253
147649 249 Revision A