Operating Manual 6175.4760.02 – 01 5.29
M3SR Series 4100 Initiating an Auto Push List Request Transmission (as Controller Feature)
It is the responsibility of the controller's operator to ensure that an APR operation (being only
of a temporary nature) is disabled (by sending for example an APR/APT=0 request to all ra-
dios) if the resumption of automatic reporting is not desired (when the radio is switched on
next time).
Selected / addressed radio providers and radio controllers with CRP (Controller Report Po-
sition) enabled will start to periodically transmit their current GPS position (if available) using
the configured time interval (assuming network and GPS synchronization is given).
In case the GPS signal has never been received by addressed participant(s), the participant
will not respond to the APR command. If the participant(s) receives the GPS signal later, it
joins the other participants already executing the auto push time operation.
The reception of the automatically pushed GPS position received from the addressed GPS
participants is described in sect. 5.2.2.10 List of Received GPS Position Information.