e-STUDIO5540C/6540C/6550C/5560C/6560C/6570C © 2011 - 2015 TOSHIBA TEC CORPORATION All rights reserved
PREVENTIVE MAINTENANCE (PM)
7 - 40
7.6.13 Bridge unit
Fig. 7-43
7.6.14 Paper exit unit
Fig. 7-44
Items to check Cleaning
Lubrica
tion/
Coating
Replacement
Operation
check
Parts
list
<P-I>
(x 1,000
sheets)
(x 1,000 drive
counts)
M1 Bridge unit transport roller-
1
A 24-17
M2 Bridge unit transport roller-
2
A23-3
M3 Bridge unit transport roller-
3
A23-4
M4 Reverse roller A 24-25
M5 Bridge unit exit roller-1 A 24-26
M6 Bridge unit exit roller-2 A 23-5
Items to check Cleaning
Lubrica
tion/
Coating
Replacement
Operation
check
Parts
list
<P-I>
(x 1,000
sheets)
(x 1,000 drive
counts)
N1 Upper paper exit roller A 36-6
N2 Lower paper exit roller A 35-27
M1
M2
M3
M4
M5
M6
N1
N2