Table
4-38
  
Inactive/Cold
Replacement
Procedure
of
Memory
(continued)
Work
Order
Task Reference
8 Installing
memory
in
the
SPARC
M12-2S,
and
placing
the
SPARC
M12-2S
that
required
maintenance
into
the
hot
state
"17.5
Installing
the
CMU
and
Memory"
9 Incorporating
the
SPARC
M12-2S
that
required
maintenance
into
the
building
block
configuration
"10.4.1
Incorporating
the
SPARC
M12-2S
Into
a
Building
Block
Configuration"
10 Diagnosing
the
SPARC
M12-2S
requiring
maintenance
(*1)
"10.5.1
Diagnosing
the
SPARC
M12
Hardware"
11 Diagnosing
the
XBU
and
crossbar
cable
of
the
SPARC
M12-2S
requiring
maintenance
"10.5.2
Diagnosing
the
XBU
and
Crossbar
Cable"
12 Confirming
that
there
is
no
problem
with
the
replacement
memory
"10.5.3
Checking
the
FRU
Status
After
Maintenance"
13 Switching
the
mode
switch
on
the
OPNL
to
Locked,
and
powering
on
the
physical
partition
containing
the
SPARC
M12-2S
that
has
undergone
maintenance
"10.8
Powering
on
a
Physical
Partition"
14 Checking
the
operating
condition
of
the
system
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
*1
If
the
replaced
memory
was
in
a
SPARC
M12-2S
with
no
PCIe
cards
mounted,
no
diagnosis
is
necessary
(because
diagnosis
was
performed
in
the
previous
step).
Table
4-39
  
Inactive/Cold
Replacement
Procedure
of
the
BPU
Work
Order
Task Reference
1 Checking
the
operating
condition
of
the
system
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
2 Confirming
the
BPU
to
be
replaced "8.2
Troubleshooting"
3 Checking
the
operation
status
of
the
SPARC
M12-2S
that
houses
the
BPU
to
be
replaced
"8.1.2
Checking
Hardware"
4 Powering
off
the
physical
partition
containing
the
SPARC
M12-2S
that
houses
the
BPU
requiring
maintenance
"9.5.1
Stopping
a
Specific
Physical
Partition"
4.4.11 Inactive/Cold
Replacement
Workflow
of
the
BPU
You
can
perform
inactive/cold
replacement
of
the
BPU
in
the
following
configuration:
â– 
Building
block
configuration
where
two
or
more
physical
partitions
are
operating
Table
4-39
shows
the
workflow
for
inactive/cold
replacement
of
the
BPU.
Fujitsu
SPARC
M12-2/M12-2S
Service
Manual
ï½¥
January
2023116

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu Oracle SPARC M12-2 and is the answer not in the manual?

Fujitsu Oracle SPARC M12-2 Specifications

General IconGeneral
BrandFujitsu
ModelOracle SPARC M12-2
CategoryServer
LanguageEnglish

Related product manuals