6-10
  
Inactive/Hot
Removal
Procedure
of
a
PCIe
Card
(continued)
Work
Order
Task Reference
11 Powering
on
the
physical
partition
containing
the
SPARC
M12-2S
that
underwent
maintenance
"10.9.1
Starting
the
System
With
an
XSCF
Command"
12 Confirming
that
there
is
no
problem
with
the
system
from
which
the
PCIe
card
was
removed
"10.5.3
Checking
the
FRU
Status
After
Maintenance"
13 Switching
the
mode
switch
on
the
OPNL
to
Locked
"2.3.2
OPNL
Control
Function"
14 Checking
the
operating
condition
of
the
system
(*1)
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
15 Saving
logical
domain
configuration
information
"9.1.1
Saving
Logical
Domain
Configuration
Information"
*1
Reassign
I/O
resources
to
logical
domains
as
required.
For
details,
see
"3.2.18
Configuring
an
I/O
Device"
in
the
Fujitsu
SPARC
M12
and
Fujitsu
M10/SPARC
M10
Domain
Configuration
Guide.
Table
6-11
  
Inactive/Hot
Removal
Procedure
of
the
HDD/SSD
Work
Order
Task Reference
1 Checking
the
operating
condition
of
the
system
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
2 Checking
the
usage
status
of
the
HDD/SSD
to
be
removed
"9.2.3
Checking
the
Usage
of
the
HDD/SSD"
3 Releasing
the
HDD/SSD
resources
assigned
to
logical
domains
"9.3
Releasing
I/O
Resources
From
a
Logical
Domain
"
4 Confirming
that
you
can
release
the
HDD/SSD
to
be
removed
(*1)
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
5Saving
logical
domain
configuration
information
"9.1.1
Saving
Logical
Domain
Configuration
Information"
6 Powering
off
the
physical
partition
containing
the
SPARC
M12-2S
from
which
to
remove
the
HDD/SSD
"9.5.1
Stopping
a
Specific
Physical
Partition"
6.3.2 Inactive/Hot
Removal
Workflow
of
the
HDD/SSD
You
can
perform
inactive/hot
removal
of
the
HDD/SSD
in
the
following
configuration:
â– 
Building
block
configuration
where
two
or
more
physical
partitions
are
operating
Before
removing
the
HDD/SSD,
see
"Precautions
for
HDD/SSD
removal"
in
"7.3
Precautions
for
FRU
Reduction."
Table
6-11
shows
the
workflow
for
inactive/hot
removal
of
the
HDD/SSD.
Fujitsu
SPARC
M12-2/M12-2S
Service
Manual
ï½¥
January
2023204

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu Oracle SPARC M12-2 and is the answer not in the manual?

Fujitsu Oracle SPARC M12-2 Specifications

General IconGeneral
BrandFujitsu
ModelOracle SPARC M12-2
CategoryServer
LanguageEnglish

Related product manuals