XSCF>
showhardconf
SPARC
M12-2S;
+
Serial:2081232002;
Operator_Panel_Switch:Service
;
+
System_Power:On;
System_Phase:Cabinet
Power
On;
Partition#0
PPAR_Status:Running;
(Omitted)
XSCF>
showlogs
event
May
30
14:00:13
JST
2016
power
switch
pushed
(short)
May
30
14:01:13
JST
2016
power
switch
pushed
(long)
May
30
14:01:16
JST
2016
PPAR-ID
0:shutdown
started
(Omitted)
XSCF>
showpparstatus
-a
PPAR-ID
PPAR
Status
00
Powered
Off
01
Powered
Off
02
Powered
Off
03
Powered
Off
XSCF>
4.
Press
down
the
POWER
switch
on
the
OPNL
for
4
seconds
or
longer.
For
details
on
the
POWER
switch,
see
"2.3.2
OPNL
Control
Function."
5.
Confirm
the
instruction
to
stop
the
physical
partitions.
If
you
do
not
push
down
the
POWER
switch
long
enough,
the
message
"power
switch
pushed
(short)"
appears.
If
so,
try
again
to
press
down
the
POWER
switch
for
4
seconds
or
longer.
6.
Confirm
that
all
physical
partitions
have
stopped.
9.6 Releasing
FRUs
From
the
System
This
section
describes
the
procedure
for
releasing
a
FRU
from
the
system.
â– 
Releasing
the
SPARC
M12-2S
From
the
Building
Block
Configuration
â– 
Releasing
the
FANU
â– 
Releasing
the
PSU
â– 
Releasing
the
XSCFU
Fujitsu
SPARC
M12-2/M12-2S
Service
Manual
ï½¥
January
2023310

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu Oracle SPARC M12-2 and is the answer not in the manual?

Fujitsu Oracle SPARC M12-2 Specifications

General IconGeneral
BrandFujitsu
ModelOracle SPARC M12-2
CategoryServer
LanguageEnglish

Related product manuals