EasyManua.ls Logo

Fujitsu Oracle SPARC M12-2

Fujitsu Oracle SPARC M12-2
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table
6-18
  
Inactive/Cold
Removal
Procedure
of
the
SPARC
M12-2S
(continued)
Work
Order
Task Reference
10 Saving
logical
domain
configuration
information
"9.1.1
Saving
Logical
Domain
Configuration
Information"
*1
If
the
removal
of
the
SPARC
M12-2S
does
not
affect
logical
domains,
this
work
is
not
required.
*2
Reconfigure
logical
domains
as
required.
For
details,
see
"Chapter
3
Operations
for
Domain
Configuration"
in
the
Fujitsu
SPARC
M12
and
Fujitsu
M10/SPARC
M10
Domain
Configuration
Guide.
*3
Set
the
physical
partition
definitions
again
as
required.
Table
6-19
  
System-Stopped/Hot
Removal
Procedure
of
a
PCIe
Card
Work
Order
Task Reference
1 Checking
the
operating
condition
of
the
system
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
2 Checking
the
usage
status
of
the
PCIe
card
to
be
removed
"9.2.2
Checking
the
Assignment
Status
of
I/O
Devices"
6.5 System-Stopped/Hot
Removal
Workflows
This
section
describes
the
workflows
for
system-stopped/hot
removal
of
the
FRUs
mounted
in
the
SPARC
M12-2/M12-2S.
Before
performing
removal
work,
be
sure
to
check
the
notes
on
maintenance
work
in
the
Fujitsu
SPARC
M12
Product
Notes
of
the
XCP
version
used.
Each
of
the
following
sections
puts
together
the
order
of
work
and
the
tasks
for
each
FRU
into
a
table.
For
details
on
each
task,
see
the
reference
shown
in
the
table.
The
following
FRUs
are
subject
to
system-stopped/hot
removal:
PCIe
card
HDD/SSD
PCI
expansion
unit
6.5.1 System-Stopped/Hot
Removal
Workflow
of
a
PCIe
Card
Before
removing
a
PCIe
card,
see
"Precautions
for
PCIe
card
removal"
in
"7.3
Precautions
for
FRU
Reduction."
Table
6-19
shows
the
workflow
for
system-stopped/hot
removal
of
a
PCIe
card.
Chapter
6
 
FRU
Removal
Workflows 215

Table of Contents

Related product manuals