Table
4-37
  
Inactive/Cold
Replacement
Procedure
of
the
CMU
(continued)
Work
Order
Task Reference
13 Switching
the
mode
switch
on
the
OPNL
to
Locked,
and
powering
on
the
physical
partition
containing
the
SPARC
M12-2S
that
has
undergone
maintenance
"10.8
Powering
on
a
Physical
Partition"
14 Checking
the
operating
condition
of
the
system
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
*1
If
you
replaced
a
CMU
that
uses
the
hardware
RAID
function,
enable
the
hardware
RAID
function
before
starting
Oracle
Solaris.
*2
If
the
replaced
CMUU
was
in
a
SPARC
M12-2S
with
no
PCIe
cards
mounted,
or
if
the
CMUL
was
replaced,
no
diagnosis
is
necessary
(because
diagnosis
was
performed
in
the
previous
step).
Table
4-38
  
Inactive/Cold
Replacement
Procedure
of
Memory
Work
Order
Task Reference
1 Checking
the
operating
condition
of
the
system
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
2 Confirming
the
memory
to
be
replaced "8.2
Troubleshooting"
3 Checking
the
operation
status
of
the
SPARC
M12-2S
that
houses
the
memory
to
be
replaced
"2.2.2
Checking
Memory
Information"
4 Powering
off
the
physical
partition
containing
the
SPARC
M12-2S
that
houses
the
memory
requiring
maintenance
"9.5.1
Stopping
a
Specific
Physical
Partition"
5 Switching
the
mode
switch
on
the
OPNL
to
Service
"2.3.2
OPNL
Control
Function"
6 Releasing
the
SPARC
M12-2S
requiring
maintenance
from
the
building
block
configuration
"9.6.1
Releasing
the
SPARC
M12-2S
From
the
Building
Block
Configuration"
7Placing
the
SPARC
M12-2S
requiring
maintenance
into
the
cold
state,
and
remo ving
memory
from
the
SPARC
M12-2S
"17.4
Removing
the
CMU
or
Memory"
4.4.10 Inactive/Cold
Replacement
Workflow
of
Memory
You
can
perform
inactive/cold
replacement
of
memory
in
the
following
configuration:
â– 
Building
block
configuration
where
two
or
more
physical
partitions
are
operating
Before
replacing
the
memory,
see
"Precautions
for
CMU
and
memory
replacement"
in
"7.1
Precautions
for
FRU
Replacement."
Table
4-38
shows
the
workflow
for
inactive/cold
replacement
of
memory.
Chapter
4
 
FRU
Replacement
Workflows 115

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu Oracle SPARC M12-2 and is the answer not in the manual?

Fujitsu Oracle SPARC M12-2 Specifications

General IconGeneral
BrandFujitsu
ModelOracle SPARC M12-2
CategoryServer
LanguageEnglish

Related product manuals