EasyManuals Logo

Fujitsu Oracle SPARC M12-2 User Manual

Fujitsu Oracle SPARC M12-2
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #232 background imageLoading...
Page #232 background image
Table
6-15
  
Inactive/Cold
Removal
Procedure
of
the
CMUU
Work
Order
Task Reference
1 Checking
the
operating
condition
of
the
system
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
2 Powering
off
the
physical
partition
containing
the
SPARC
M12-2S
that
houses
the
CMUU
to
be
removed
"9.5.1
Stopping
a
Specific
Physical
Partition"
3 Switching
the
mode
switch
on
the
OPNL
to
Service
"2.3.2
OPNL
Control
Function"
4 Releasing
the
SPARC
M12-2S
that
houses
the
CMUU
to
be
removed,
from
the
building
block
configuration
"9.6.1
Releasing
the
SPARC
M12-2S
From
the
Building
Block
Configuration"
5 Enabling
the
removal
of
the
CMUU "17.4.1
Enabling
the
Removal
of
the
CMU"
6Removing
the
CMUU
from
the
SPARC
M12-2S
"17.4.2
Removing
the
CMU"
7
Installing
a
filler
unit
in
the
SPARC
M12-2S
"17.5.2
Installing
the
CMU"
8 Assembling
the
SPARC
M12-2S
from
which
the
CMUU
was
removed
"17.5.3
Restoring
the
Server"
9 Incorporating
the
SPARC
M12-2S
from
which
the
CMUU
was
removed
into
the
building
block
configuration
"10.4.1
Incorporating
the
SPARC
M12-2S
Into
a
Building
Block
Configuration"
10 Diagnosing
the
SPARC
M12-2S
from
which
the
CMUU
was
removed
(*1)
"10.5.1
Diagnosing
the
SPARC
M12
Hardware"
11 Diagnosing
the
XBU
and
crossbar
cable,
in
the
building
block
configuration,
of
the
SPARC
M12-2S
from
which
the
CMUU
was
removed
"10.5.2
Diagnosing
the
XBU
and
Crossbar
Cable"
12 Confirming
that
there
is
no
problem
with
the
system
from
which
the
CMUU
was
removed
"10.5.3
Checking
the
FRU
Status
After
Maintenance"
13 Reconfiguring
the
I/O
bus
as
required
(*2) "3.2.18
Configuring
an
I/O
Device"
in
the
Fujitsu
SPARC
M12
and
Fujitsu
M10/SPARC
M10
Domain
Configuration
Guide
14 Switching
the
mode
switch
on
the
OPNL
to
Locked
"2.3.2
OPNL
Control
Function"
15 Powering
on
the
physical
partition
containing
the
SPARC
M12-2S
that
underwent
maintenance
"10.9.1
Starting
the
System
With
an
XSCF
Command"
16 Checking
the
operating
condition
of
the
physical
partition
and
logical
domains
(*3)
"9.2.1
Checking
the
Operation
Status
of
Physical
Partitions
and
Logical
Domains"
Table
6-15
shows
the
workflow
for
inactive/cold
removal
of
the
CMUU.
Fujitsu
SPARC
M12-2/M12-2S
Service
Manual
ï½¥
January
2023210

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu Oracle SPARC M12-2 and is the answer not in the manual?

Fujitsu Oracle SPARC M12-2 Specifications

General IconGeneral
BrandFujitsu
ModelOracle SPARC M12-2
CategoryServer
LanguageEnglish

Related product manuals