EasyManuals Logo

Fujitsu Oracle SPARC M12-2 User Manual

Fujitsu Oracle SPARC M12-2
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #341 background imageLoading...
Page #341 background image
XSCF>
initbb
-b
2
You
are
about
to
initialize
BB/XB-Box.
NOTE
the
following.
1.
BB/XB-Box
is
exclueded
from
the
system
and
halted.
2.
PPAR-ID
of
the
same
value
as
BB-ID
becomes
invalid.
Continue?
[y|n]
:
y
XSCF>
XSCF>
showboards
-a
-v
PSB
R
PPAR-ID(LSB)
Assignment
Pwr
Conn
Conf
Test
Fault
----
-
------------
-----------
----
----
----
-------
--------
00-0
00(00)
Assigned
y
y
y
Passed
Normal
01-0
00(01)
Assigned
y
y
y
Passed
Normal
XSCF>
Crossbar cable
Power cord
XSCF DUAL
control cable
XSCF BB
control cable
4.
Release
the
SPARC
M12-2S
from
the
building
block
configuration.
5.
Check
that
the
LEDs
of
the
released
SPARC
M12-2S
are
off.
Wait
for
the
READY,
CHECK,
and
MASTER
LEDs
on
the
XSCFU
to
turn
off.
(Approx.
10
minutes)
For
the
LEDs
on
the
XSCFU,
see
"Figure
2-11."
6.
Check
the
status
of
the
building
block
configuration.
Check
that
the
released
SPARC
M12-2S
is
not
displayed.
7.
Disconnect
the
power
cord,
crossbar
cable,
XSCF
BB
control
cable,
and
XSCF
DUAL
control
cable.
Disconnect
all
the
cables
connected
to
the
locations
enclosed
in
dotted
lines.
Note
that,
when
the
XSCFU
is
the
slave
XSCF,
the
XSCF
DUAL
control
cable
is
not
connected.
Figure
9-5
  
Disconnecting
Cables
8.
Set
the
BB-ID
of
the
released
SPARC
M12-2S.
To
release
the
SPARC
M12-2S
and
use
it
as
another
system,
set
the
BB-ID
as
appropriate
for
the
system
configuration.
Chapter
9
 
Releasing
FRUs
From
the
System 319

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu Oracle SPARC M12-2 and is the answer not in the manual?

Fujitsu Oracle SPARC M12-2 Specifications

General IconGeneral
BrandFujitsu
ModelOracle SPARC M12-2
CategoryServer
LanguageEnglish

Related product manuals