EasyManua.ls Logo

Hach sc200 - Typical EBM Installation

Hach sc200
875 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
Eaton
®
9130 UPS (700–3000 VA) User's Guide S 164201718 Rev 3 www.eaton.com/powerquality
28
C A U T I O N
A small amount of arcing may occur when connecting an EBM to the UPS. This is normal and
will not harm personnel. Insert the EBM cable into the UPS battery connector quickly and
firmly.
5. Plug the EBM cable(s) into the battery connector(s) as shown in
Figure 13. Up to four EBMs may be connected to the UPS.
Up to 1500 VA models. Unclip the EBM connector on the UPS battery
panel and connect it to the EBM connector on the EBM. Press the
two parts tightly together to ensure a proper connection.
2000–3000 VA models. Connect red to red, black to black, and green to
green. Press the two parts tightly together to ensure a proper
connection.
All models. To connect a second EBM, unclip the EBM connector on
the first EBM and pull gently to extend the wiring to the EBM
connector on the second EBM. Repeat for any additional EBMs.
6. Verify that the EBM connections are tight and that adequate bend
radius and strain relief exist for each cable.
Up to 1500 VA Models 2000–3000 VA Models
Figure 13. Typical EBM Installation

Table of Contents

Other manuals for Hach sc200

Related product manuals