Model 6 Motor Control Centers 80459-641-01E
Section 4—Installing the MCC 10/2012
© 1999–2012 Schneider Electric All Rights Reserved28
ENGLISH
Splice Gaskets for NEMA Type 1
Gasketed and Type 12 Enclosures
When splicing to an existing MCC, refer to Figure 18. If P gasket is not
installed, follow the instructions in “Splicing With No P Gasketing” on
page 29. If P gasket is installed, follow the instructions in “Splicing With P
Gasketing” on page 29.
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Apply appropriate personal protective equipment (PPE) and follow safe
electrical work practices. See NFPA 70E or CSA Z462.
This equipment must only be installed and serviced by qualified
electrical personnel.
Turn off all power supplying the equipment before working on or inside
equipment.
Always use a properly rated voltage sensing device to confirm power is
off.
Replace all devices, doors, and covers before turning on power to this
equipment.
When moving MCC sections, follow the instructions in “Handling the
MCC” on page 15. The MCC has a high center of gravity, which may
cause it to tilt.
Failure to follow this instruction will result in death or serious injury.
Figure 18: P Gasketing
Left Side Right Side
Corner
channels
P gasket
Top tie
channels