EasyManua.ls Logo

Hach sc200 - To Set the Restart and Shutdown Delay Times for each Load Segment

Hach sc200
875 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
Eaton
®
9130 UPS (700–3000 VA) User's Guide S 164201718 Rev 3 www.eaton.com/powerquality
50
To set the restart and shutdown delay times for each load segment:
1. Press any button to activate the menu options, then select
SETTINGS, USER SETTINGS and AUTOMATIC START DELAY.
2. Set the restart delay for one load segment, and ENTER to confirm.
3. Set the other load segment if applicable.
4. Select AUTOMATIC ON BATTERY SHUTDOWN.
5. Set the shutdown delay for one load segment, and ENTER to
confirm.
6. Set the other load segment if applicable.
NOTE Load segment On/Off commands issued through the Control menu overrule the user
settings for load segments.

Table of Contents

Other manuals for Hach sc200

Related product manuals