EasyManua.ls Logo

Hach sc200 - Page 678

Hach sc200
875 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model 6 Motor Control Centers 80459-641-01E
List of Figures 10/2012
© 1999–2012 Schneider Electric All Rights Reserved6
ENGLISH
List of Figures Figure 1: Model 6 MCC 100 ms Arc-Rated Option Label and Typical
Location on Enclosure .........................................................10
Figure 2: Motor Control Center Packaged in Sideways Position
(Typical for Most Sections) ..................................................14
Figure 3: Motor Control Center Packaged in Upright Position
(Typical for Extra Heavy Sections such as 18-Pulse Drives
or as Customer Option) .......................................................14
Figure 4: Moving the MCC with a Fork Truck ......................................16
Figure 5: Proper Use of Sling to Lift MCCs .........................................16
Figure 6: Proper/Improper Lifting Points for Plug-in Units Taller Than
24 in. .......................................................................................17
Figure 7: Required Obstruction-Free Area ..........................................19
Figure 8: Motor Control Center Views .................................................20
Figure 9: Base Channel Notches ........................................................21
Figure 10: Hardware Kit ........................................................................21
Figure 11: Bolting Sections Together ....................................................22
Figure 12: Standard Base Channel Mounting .......................................23
Figure 13: Base Channel Mounting For 18-Pulse AC Drive
MCC Sections ......................................................................23
Figure 14: NEMA Type 1, Type 1 Gasketed, and Type 12 Seismic
Tie-Down Locations .............................................................25
Figure 15: Seismic Tie-Down Locations for 18-Pulse AC Drive
MCC Sections ......................................................................25
Figure 16: NEMA Type 3R Seismic Tie-Down Locations ......................26
Figure 17: Attachment Locations for Top Lateral Bracing .....................27
Figure 18: P Gasketing .........................................................................28
Figure 19: Removing the End Deflector ................................................30
Figure 20: Removing the Insulating Barrier ..........................................31
Figure 21: Installing the Deflector Bracket ............................................31
Figure 22: Re-attaching the Back Plates ..............................................32
Figure 23: Installing the Splice Deflector ..............................................33
Figure 24: Remove Mid and End Deflector Caps from the Top
of the MCC ...........................................................................34
Figure 25: Attach the Multi-section Bracket ..........................................34
Figure 26: Secure the Vertical Channels ..............................................34
Figure 27: Replace Lifting Angle Hardware ..........................................34
Figure 28: Horizontal Wireway Covers and Bus Barriers Removed .....35
Figure 29: Correct Application of Splice (shown installed) for
600/800 A, Non-Fork Bus ....................................................36
Figure 30: Incorrect Application of Single-Bar Splice on Fork-Type Bus ...36
Figure 31: Removing Bolts from Single-Splice Bar ...............................36
Figure 32: Moving and Aligning the Splice Bar to the Bus Holes ..........37
Figure 33: Inserting Splice Bolts in the Left and Right Sections ...........37
Figure 34: Placing a Conical Washer Under the Bolt Head ..................37
Figure 35: Torquing the Bolts ................................................................37
Figure 36: Removing the Left Bolts and Loosening the Right Bolts
on the Splice Assembly .......................................................38
Figure 37: Aligning the Splice and Bus Holes .......................................38
Figure 38: Inserting the Splice Bolts .....................................................39
Figure 39: Placing a Conical Washer Under the Bolt Head ..................39
Figure 40: Torquing the Bolts ................................................................39
Figure 41: Wireway Covers Removed and Horizontal Bus Barriers Open 40
Figure 42: Loosen Bolts ........................................................................40
Figure 43: 85,000 A Bracing Option ......................................................40
Figure 44: Slide the Splice Assembly to the Left ..................................41
Figure 45: Inserting the Splice Bolts ..........................
...........................41
Figure 46: Place a Conical Washer Under the Bolt Head .....................41
Figure 47: Torque All Bolts ...................................................................41

Table of Contents