EasyManua.ls Logo

Hach sc200 - Page 679

Hach sc200
875 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80459-641-01E Model 6 Motor Control Centers
10/2012 List of Figures
© 1999–2012 Schneider Electric All Rights Reserved
7
ENGLISH
Figure 48: Ground Splice Bar as Shipped ............................................42
Figure 49: Ground Bar Bolt Replaced ................................................... 42
Figure 50: Wireway Covers Removed and Horizontal Bus Barriers Open 43
Figure 51: Removing the Bolts from the Splice Assembly ....................43
Figure 52: Aligning the Splice and Bus Holes ....................................... 43
Figure 53: Inserting the Splice Bolts .....................................................43
Figure 54: Place a Conical Washer Under the Bolt Head ..................... 43
Figure 55: Torque All Bolts ...................................................................44
Figure 56: Splicing Offset Horizontal Bus .............................................45
Figure 57: Remove the Hardware ......................................................... 46
Figure 58: Reposition and Attach the Vent Hood .................................... 47
Figure 59: Remove the Hardware ......................................................... 48
Figure 60: Install the Pull Box ...............................................................48
Figure 61: Wiring in the Top Horizontal Wire Trough ...........................49
Figure 62: Vertical Wire Trough Grommet ............................................49
Figure 63: Pull-apart Type Terminal Blocks .......................................... 49
Figure 64: Typical Cabled Disconnect Unit ........................................... 50
Figure 65: Typical Horizontal Bus Assembly ........................................50
Figure 66: Main Lug Compartment Torque Connection .......................51
Figure 67: Size 1 and 2 Fuse Clip Locations ........................................52
Figure 68: Pre-operation Check ............................................................ 53
Figure 69: Typical Bus Connection Points ............................................55
Figure 70: Main Lug Compartment Torque Connection .......................56
Figure 71: Control Unit .......................................................................... 56
Figure 72: Operator Mechanism in the OFF Position ...........................57
Figure 73: Loosening Captive Fasteners ..............................................57
Figure 74: Arc-Rated MCC Door Latches .............................................57
Figure 75: Releasing the Lock-in Device (when supplied) .................... 58
Figure 76: Disconnected Terminal Blocks ............................................58
Figure 77: Power Leads and Top of Terminal Blocks Fed Through
Wiring Port ........................................................................... 58
Figure 78: Pulling the Twin Handle Cam Mechanism Forward ............. 58
Figure 79: Operating the Mechanism-to-Structure Interlock .................59
Figure 80: Locked Out Device ..............................................................59
Figure 81: Control Unit Removed .........................................................59
Figure 82: Control Unit with Bottom Plate Folded Down ......................59
Figure 83: Driving Out Hinge Pin ..........................................................60
Figure 84: Operator Handle in the OFF Position ..................................61
Figure 85: Loosening Captive Fasteners ..............................................61
Figure 86: Control Station Plate Removed ...........................................61
Figure 87: Operator Handle and Interlock Release ..............................62
Figure 88: Stab Assembly ..................................................................... 62
Figure 89: Operator Mechanism in the Tripped Position ......................63
Figure 90: Inspecting Fuses .................................................................63
Figure 91: Starter Contacts ................................................................... 63
Figure 92: Control Devices ...................................................................64
Figure 93: Tripping the Overload Relay ................................................64
Figure 94: Tightening Electrical Connections .......................................64
Figure 95: Manual and Automatic Bus Shutters ...................................65
Figure 96: Typical Bus Connection Points ............................................68
Figure 97: Operating Door Interlock Defeat Mechanism ...........
...........68
Figure 98: Motor Logic SSOLR ............................................................. 69
Figure 99: NEMA Rated Compac™ 6 Unit ...........................................69
Figure 100: NEMA Rated Standard Unit .................................................69
Figure 101: Looping Passes ................................................................... 71
Figure 102: Motor Logic Overload (Bottom View) ................................... 71
Figure 103: Unit Adjustment Label .........................................................72
Figure 104: Mag-Gard Magnetic Trip Adjustment ................................... 73
Figure 105: PowerPact H- and J-frame Magnetic Trip Adjustment ........74

Table of Contents