Load from DUT Manager
Use "Load from DUT Manager" to load a previously configured mixer from the DUT
manager.
This will open a dialog that allows you to select the DUT to be loaded:
Save to DUT Manager
Use "Save to DUT Manager" to persist new/modified mixer settings to the DUT man-
ager when you proceed to the next step of the "DUT Centric Wizard". If a DUT with the
same name exists, you are asked whether you want to overwrite the existing DUT con-
figuration, or to create a DUT with a different name.
DUT/VNA Connections
The "DUT/VNA Connections" page of the "DUT Sentric Wizard" allows you to configure
the RF connections between VNA and DUT.