EasyManua.ls Logo

Ricoh B234 - Page 1296

Ricoh B234
1335 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
TEST OPERATION
y Check to ensure that the paper chip tray is securely in place.
y Check to ensure that a Die Set is installed properly and that any extra Die Sets are securely
stored in the Die Storage Area.
y Run a small test job in “Bypass” mode. Check to ensure that the job is not punched and
bypasses properly.
y Run a small job with Punch Enabled. Check the punched holes of the job.
GBC STREAMPUNCH INSTALLATION AND SET-UP
REFERENCE ILLUSTRATION – FOR MT-C3 & VC-1 ONLY
GBC STREAMPUNCH INSTALLATION AND SET-UP
REFERENCE ILLUSTRATION - FOR BC-3
Input Guide
1
GBC Streampunch
Interconnect
Communication
Cable
To Streampunch
To Printer
Secure IC
bracket w/
wire tie-wrap

Table of Contents

Other manuals for Ricoh B234

Related product manuals