LCIT RT5000 (B832)
SM 1-53 B234/B235/B236/D101/D102/D103
Installation
11. Attach the harness clamps , , to the LCT.
12. Set the harnesses in the clamps, then close them (=x3).
13. Attach the LCT relay harness [B] to the mainframe.
14. Reconnect the ground wire [C] to the mainframe ( x1).
15. Dock the LCT to the mainframe.
• Lock bar ( x1)
• Interface cable
NOTE: Confirm that neither the relay harness nor ground wire is pinched
between the mainframe and the LCT.
B832I123.WMF
B832I124.WMF
[A]
[B]
[C]