214603 229 Revision A
4.5.3 Detaching a D Series or D1 SP Series Header
Detaching a D Series or D1 SP Series Header: Hydraulic Center-Link
DANGER
To avoid bodily injury or death from unexpected startup of the machine, always stop the engine and
remove the key from the ignition before leaving the operator’s seat for any reason.
Figure 4.132: Ground Speed Lever (GSL)
1. Start engine and press HEADER UP switch (A) to raise
header to maximum height.
2. Rephase cylinders if one end of the header does not
raise fully. If rephasing is required, proceed as follows:
a. Press and hold the HEADER UP switch (A) until
both cylinders stop moving.
b. Continue to hold the switch for 3–4 seconds.
Cylinders are now phased.
3. Stop engine, and remove key.
Figure 4.133: Safety Prop
4. Pull lever (A) and rotate toward header to lower safety
prop (B) onto cylinder. Repeat for opposite cylinder.
OPERATION