EasyManua.ls Logo

MacDon M205 - Detaching an a Series Header; Detaching an a Series Header: Hydraulic Center-Link

MacDon M205
514 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
214603 244 Revision A
4.5.5 Detaching an A Series Header
Detaching an A Series Header: Hydraulic Center-Link
DANGER
To avoid bodily injury or death from unexpected startup of the machine, always stop the engine and
remove the key from the ignition before leaving the operators seat for any reason.
1008946
A
Figure 4.172: Ground Speed Lever
1. Start the engine and press HEADER UP switch (A) on
the ground speed lever (GSL) to raise the header to
maximum height.
2. If one end of the header does NOT raise fully, rephase
the cylinders as follows:
a. Press and hold the HEADER UP switch (A) until
both cylinders stop moving.
b. Continue to hold the switch for 34 seconds.
Cylinders are now phased.
3. Stop the engine and remove the key.
DANGER
To avoid bodily injury from fall of raised header, always engage safety props when working on or
around raised header, and before going under header for any reason.
OPERATION

Table of Contents

Other manuals for MacDon M205

Related product manuals