Chapter 5
Maintenance and Repair
P/N 57150002, Revision 5.0 5 - 137 Trimble S, VX, SPS & RTS Service Manual
F
Fig. 5-129 Activate tracker unit
5 Install / change
configuration key 1.
A. Confirm switch off of
instrument by click
OK,
see Fig. 5-131 on page
5-137 .
Fig. 5-130 Install / change configuration key
Fig. 5-131 Instrument switch off
6 Verify tracker is
installed.
Check result to see that
tracker is activated.
Item Performance Action Results Notes