Chapter 6
Adjustment and verification
P/N 57150002, Revision 5.0 6 - 105 Trimble S, VX, SPS & RTS Service Manual
F
Adjustment of receiver fibre to APD maximum
This adjustment is required if the transceiver board or receiver fibre is replaced.
Fig. 6-117 Receiver fibre alignment
Fig. 6-118 Receiver fibre alignment
17 Exit software. A. Remove Illumination
RX S6/5600 with
adapter.
B. Click
Exit.
Item Performance Description Result Notes
1 Prepare instrument. Mount the instrument on
the collimator bench or on
a stable base.
2 Start up instrument /
PASS.
See page 7-3 how to set-up
the instrument.
Item Performance Description Result Notes
A&B
The spot moves like this:
A&B
D