Chapter 6
Adjustment and verification
P/N 57150002, Revision 5.0 6 - 147 Trimble S, VX, SPS & RTS Service Manual
F
Tracker collimation
Performance
Fig. 6-158 Result of Laser power test
4 Exit software. Click
Exit button.
Item Performance Description Result Notes
1 Start up instrument /
PASS.
See page 7-3 how to set-
up the instrument.
Item Performance Description Result Notes
Laser power
test result