EasyManua.ls Logo

MacDon M205 - Page 208

MacDon M205
514 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
214603 188 Revision A
1008705
A
B
Figure 4.52: Lift Linkage
13. Move float pins from storage location (A) to engaged
position (B).
1008947
A
Figure 4.53: GSL
14. Start engine and press HEADER DOWN switch (A) on
ground speed lever (GSL) to lower lift arms until the
rear of the arms lift away from the linkage.
1000722
A
B
C
Figure 4.54: Weight Box
15. Attach slow speed transport hitch to the weight box
tongue with drawbar pin. Secure using lynch pin (A).
Attach safety chain (B).
16. Connect hitch harness (C) to electrical socket at front of
weight box.
OPERATION

Table of Contents

Other manuals for MacDon M205

Related product manuals