EasyManua.ls Logo

MacDon M205 - Page 255

MacDon M205
514 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
214603 235 Revision A
1008809
A
B
Figure 4.148: Hydraulic Center-Link
6. Adjust center-link cylinder (A) position with the REEL
UP and REEL DOWN switches on the GSL until the
hook is positioned above the header attachment pin.
IMPORTANT:
The hook release must be down to enable the self-
locking mechanism. If the release is open (up),
manually push it down after hook engages header pin.
7. Lower center-link (A) onto the header with the REEL
DOWN switch until the center-link locks into position
and the hook release (B) is down.
8. Check that center-link is locked onto header by
pressing the REEL UP switch on the GSL.
CAUTION
Check to be sure all bystanders have cleared the area.
1008946
A
Figure 4.149: Ground Speed Lever
9. Press HEADER UP switch (A) to raise the header to
maximum height.
10. If one end of the header does NOT fully raise, rephase
the lift cylinders as follows:
a. Press and hold the HEADER UP switch until both
cylinders stop moving.
b. Continue to hold the switch for 34 seconds.
Cylinders are now phased.
NOTE:
It may be necessary to repeat this procedure if there is
air in the system.
OPERATION

Table of Contents

Other manuals for MacDon M205

Related product manuals