E5071C
138
7. Connect a SHORT calibration standard to the selected test port
(connector to which the DUT is to be connected).
8. Click Short to start the calibration measurement.
9. Connect a LOAD calibration standard to the selected test port
(connector to which the DUT is to be connected).
10. Click Load to start the calibration measurement.
11. Click Done to terminate the 1-port calibration process. Upon
pressing this key, calibration coefficients will be calculated and
saved. The error correction function will also be automatically
enabled.
Connecting the standard for 1-port calibration