Measurement
147
12. Connect a LOAD standard to each of the four test ports
(connectors to which the DUT is to be connected).
13. Click Port 1-2 Isol to start the calibration measurement.
14. Perform the each calibrations by clicking Port 1-3 Isol, Port 1-4
Isol, Port 2-3 Isol and Port 2-4 Isol.
15. Click Return.
16. Click Done to terminate the full 4-port calibration process. Upon
pressing this key, calibration coefficients will be calculated and
saved. The error correction function will also be automatically
enabled.
Connecting standards in full 4-port calibration