EasyManua.ls Logo

GBC AdvancedPunch Pro - GP 6.4 Dock the Punch (Moving the Punch to Operating Position)

GBC AdvancedPunch Pro
400 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
General Procedures and Information 09/11/2018 GBC AdvancedPunch Pro
6-54
GP 6.4 Dock the punch (Moving the punch to Operating position)
Use this procedure to move the AdvancedPunch Pro to operating
position.
1. Slide the punch to Operating position
Note: If the AdvancedPunch Pro does not easily slide to Operating and
Service positions, level the AdvancedPunch Pro using the adjustable
casters.
2. Latch the docking bracket and install the M3 screw.
3. For DFA configurations- Install the (2) screws.
4. For DFA configurations- Install the ground straps to the Rear
cover of AdvancedPunch Pro.
5. Run a small test job in both Punch and Bypass mode to ensure
the machine is working properly.

Table of Contents

Other manuals for GBC AdvancedPunch Pro

Related product manuals