GBC AdvancedPunch Pro 08/20/2015 Installation Instructions- DFA
8-7
4. Insert the Bolts (2) through the Locking Bracket and the Lift Kit
Assembly.
5. Tighten the M6x16 Screws (2).
6. Set the Caster Wrench aside .
You will use the Caster Wrench to level the AdvancedPunch Pro and
the Lift Kit Assembly.
8.3.2 Rotate the AdvancedPunch Pro to the upright Position
1. Have two (2) people shift and rotate the AdvancedPunch Pro until two
(2) of the Casters touch the floor.
2. Have two (2) people shift and rotate the AdvancedPunch Pro stand it
upright on the Casters (4).
3. Make sure the AdvancedPunch Pro stands firmly upright on the
Casters (4).