Installation Instructions- DFA 08/20/2015 GBC AdvancedPunch Pro
8-10
8.8. Level the Punch
Do the following to level the AdvancedPunch Pro with the upstream
device (SEM Module).
1. Open the front door of the SEM Module.
2. Remove the 7mm screws (2) and the Trim Strip from the SEM
Module.
3. Move the AdvancedPunch Pro into position against the upstream
device (SEM Module).
4. Check the level of the AdvancedPunch Pro front to rear.
5. Check the level of the AdvancedPunch Pro left to right