EasyManua.ls Logo

GBC AdvancedPunch Pro - Level the Punch

GBC AdvancedPunch Pro
400 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Instructions- DFA 08/20/2015 GBC AdvancedPunch Pro
8-10
8.8. Level the Punch
Do the following to level the AdvancedPunch Pro with the upstream
device (SEM Module).
1. Open the front door of the SEM Module.
2. Remove the 7mm screws (2) and the Trim Strip from the SEM
Module.
3. Move the AdvancedPunch Pro into position against the upstream
device (SEM Module).
4. Check the level of the AdvancedPunch Pro front to rear.
5. Check the level of the AdvancedPunch Pro left to right

Table of Contents

Other manuals for GBC AdvancedPunch Pro

Related product manuals