4. Select the test ports (and corresponding S parameters) upon which a
THRU response calibration is to be performed.
5. Make a between the selected test ports (between the connectors to
which the DUT will be connected).
6. Click Thru to start the calibration measurement.
o The sweep is performed twice in the one thru
measurement.
7. If an isolation calibration must be performed using a LOAD standard,
follow the procedure below.
6.
a. Connect a LOAD standard to each of the two selected test ports
(connectors to which the DUT is to be connected).