RX100 S7
Upgrade and Maintenance Manual 119
Power supply
6.2.13 Concluding steps
Ê Perform the following procedures:
1. "Closing the server" on page 66
2. "Installing the server in the rack" on page 68
3. "Switching on the server" on page 72
4. "Enabling BitLocker functionality" on page 94
5. "Closing the rack door" on page 73